LONG LASTING BELZONA STEP REPAIR - EXCELLENT AFTER 20 YEARS

KHIA ID: 431
Industria: General Industry (GIND)
Solicitud: FPA-Floor Problem Areas (FPA)
Sustrato: Concrete
Ubicación del cliente: U.S. Air Force Base - Illinois U.S.A.
Fecha de aplicacion: Summer 1984
Productos:

Belzona® 4111 (Magma-Quartz)

Belzona® 1321 (Ceramic S-Metal)

Belzona® 9211 (Supergrip Aggregate)


Fecha de aplicacion: Cracked steps allowed water to leak and pool under the steps where the main building transformer is located. Of secondary concern was the absence of slip protection on the step noses.
Descripciones de fotografías

1. to 4. Various angles of the steps.

Situación de la aplicación
Steps into busy headquaters building
Método de aplicación
Application was carried out in accordance with Belzona Know-How System Leaflet FPA-8.
Datos de Belzona
All the steps and landings were rebuilt/coated with 1/4” of Belzona® 4111. Strips of Belzona® (Ceramic S-Metal) and coarse aggregate were applied for safety. Repouring of the steps would have been very expensive and most likely would have suffered the same problem after a period of time. After 20 years the steps and the non-skid are still in excellent condition. The photos were taken in April of 2004.