BELZONA AVOIDS COSTLY DOWNTIME BY PATCHING FUEL BLADDERS

KHIA ID: 5265
Industry: General Industry (GIND)
Application: SHM-Solids Handling Machinery (SHM)
Substrate: Fabric Reinforced Rubber
Customer Location: Alaska, USA
Application Date: 1983
Products:

Belzona 2221 (MP Fluid Elastomer)

Belzona 2911 (Elastomer QD Conditioner)

Belzona 9341 (Reinforcing Sheet)


Problem: Scrapes on the outer rubber layer of the large towable fuel bladders would allow water to wick into the fabric, weakening the fuel bladder.
Photograph Descriptions
  1. Bladder showing damage and prepared for conditioner
  2. Completed application
Application Situation
Damaged fuel bladders.
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet SHM-9. The surface was roughened and Belzona 2911 was applied and allowed to cure. Belzona 2221 was brushed on and Belzona 9341 was stippled in. Two hours later a final coat was brushed over the surface.
Belzona Facts
Patching the bladders was done by using a hot vulcanizer allowing them to do one path at a time. Bladders with multiple scrapes could take a week or more to repair. With Belzona 2221 several bladders could be repaired every day, putting them back in service faster and saving thousands in labor.