BELZONA CHILLER PROTECTION
Industry: Heating, Ventilation & Air Conditioning (HVAC)
Application: HEX-Heat Exchangers (HEX)
Substrate: Steel
Customer Location: Five star hotel in Egypt
Application Date: April 2005
Products:
Belzona® 1341 (Supermetalglide)
Problem: Corrosion of the tube sheet and water box.
Photograph Descriptions
- The corroded water box
- Surface preparation
- Tube sheet completed
- Water box completed
Application Situation
Chiller unit from the hotel air conditioning plant
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet HEX-3.
Belzona Facts
Long term protection was provided with minimum down time. The preparation and application arrangements did not disrupt the hotels operation as required by the management.