BELZONA KEEPS DUST SUPPRESSION BOWSER IN SERVICE AT QUARRY

KHIA ID: 4130
Industry: Mining & Quarrying (MINQ)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Steel
Customer Location: Limestone quarry, SW, England
Application Date: September 2012
Products:

Belzona® 1111(Super Metal)


Problem: Traditional welding repair had failed to seal the tank. The customer required a fast cold curing solution to bring the bowser back into service.
Photograph Descriptions

Quarry dust suppression bowser in workshop Damage and Corrosion to be repaired Initial application of Belzona® 1111 Finished application. Cure accelerated by heat

Application Situation
Dust suppression bowser had suffered damage and corrosion to its hydraulic tank causing leakage.
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet TCC-1.
Belzona Facts
The time required to remove all the ancillaries and replace the tank would have taken several days which was not acceptable as dust levels in the quarry were high increasing the risk of incident due to poor visibility. The Belzona solution had the bowser back in action the next day.