BELZONA REFURBISHES LOADING DOCK
Industry: Buildings & Structures (BSTR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Business complex, Brisbane, Queensland, Australia
Application Date: May 2009
Products:
Belzona 5231 (SG Laminate)
Belzona 4411 (Granogrip)
Problem: The Loading dock and car park were old and in need of a facelift as all of the original coating had been worn away.
Photograph Descriptions
1. The original condition of the floor area 2. Surface preparation in progress 3. A few small touch ups 4. The finished application showing the coated floor and reinstated lines, wording and chevrons
Application Situation
Loading dock and car park of a multi use business complex
Application Method
The application was carried out in accordance with Belzona System Leaflets FPA-4 and FPA-8. The floor area was prepared using a dustless diamond grinder then coated with 2 coats of the Belzona 5231. The line markings, chevrons and wording were then reinstated using Belzona 4411 in a single coat of safety yellow.
Belzona Facts
Belzona materials were chosen due to their ease of application, proven longevity and incorporated grip system that provides a safer and more durable finish than conventional floor paints.