BELZONA REPAIRED CAR PARK JOINT STILL INTACT

KHIA ID: 6294
Industry: Buildings & Structures (BSTR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Shopping Centre, Brisbane, Australia
Application Date: June 2013
Products:

Belzona 4111 (Magma Quartz)


Problem: The edge nosings of the concrete slabs had been broken down to rubble after years of daily traffic making them unsightly and dangerous
Photograph Descriptions

1. The damaged floor joint

2. Conditioned and ready for repair 

3. Repairs in progress

4. Repaired joint 3 years after completion

Application Situation
The floor joint between concrete slabs in a Car Park
Application Method
Application was carried out in accordance with Belzona System Leaflet FPA-1. The old damaged concrete was removed and cut back to a sound substrate. The area was then prepared and rebuilt with the Belzona 4111 system to restore the original profile.
Belzona Facts
Belzona 4111 was used for its high strength, fast curing and ease of application. The floor repair is still in good condition more than 3 years later.