KHIA ID: 1905Industry: Water / Wastewater (WATR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: ConcreteCustomer Location: Underground sewage plant / UK
Application Date: 2011Products:Belzona 5811 (Immersion Grade)
Problem: Prior to the application of a Belzona coating, it is required that new concrete should be allowed to cure for 28 days or until the moisture content has dropped below 6%. Unfortunately, in this application the customer could not wait for so long.
1. Tank construction
2. Before the application
3. Application of Belzona 5811
4. Completed application