BELZONA RESIN CHOCKS FOR DREDGER BOILER
Industry: Marine (MRNE)
Application: GSS-Gaskets, Seals and Shims (GSS)
Substrate: Steel
Customer Location: Port Operator, Middlesbrough, UK
Application Date: April 2015
Products:
Belzona 7111 (Marine Grade)
Problem: A new boiler required chocking into place. A secure, vibration free location was essential to its efficient operation.
Photograph Descriptions
- The boiler set in place
- Pouring Belzona 7111 into the prepared area
- Product curing around bolts
- Completed application with dams removed
Application Situation
Boiler inside engine room of dredger.
Application Method
The application was carried out in accordance with Belzona Know-How System Leaflet GSS-12. The boiler was set into place using jacking bolts, and dams were built around each of the individual bolts. Belzona 7111 was then poured into the prepared areas using a small section of steel as a runway due to the difficult access. The thickness of the pour was just over 2 inches, so a solidifier reduction was used.
Belzona Facts
The Belzona 7111 resin chocks were quickly and effectively installed and will ensure a secure, vibration free location for the boiler.