BELZONA RETURNS PIPELINE PIG BACK TO SERVICE
Industry: Water / Wastewater (WATR)
Application: SHM-Solids Handling Machinery (SHM)
Substrate: Natural Rubber
Customer Location: WasteWater Plant, Jordan
Application Date: July, 2009
Products:
Belzona® 2111 (D&A Hi Build Elastomer)
Problem: Wear on the rubber tail causes imbalance in the pig.
Photograph Descriptions
- General view of the pig
- View of the worn area
- Rebuilding surface with Belzona® 2111
- Application is finished and the responsible engineer inspects the application
Application Situation
The pig (scraper) travels more than one hundred kilometers inside huge wastewater pipes to keep walls clean.
Application Method
The application was carried out according to Belzona Know-How system leaflet SHM-9. Belzona® 2911 Conditioner was used to ensure maximum adhesion to the substrate.
Belzona Facts
Applying Belzona was time and cost effective. The conventional way to return the pig to service is by replacing the old rubber tail by a new one which is expensive, needs long time to be imported and takes not less than three days to replace. Belzona application was done in one hour with significant savings in cost.