Problem: Leaking pipe was affecting efficiency of the cooling system. Back pressure meant repair had to be carried out live and to a very tight schedule. Adjacent section of pipe had previously been repaired with Belzona.
The leak Belzona® 1111 wrap completed Completed application protected with Belzona® 1341 Note earlier repair immediately below latest repair