80 TONNE BULLDOZER TRACKS-NO PROBLEM FOR BELZONA
Industry: General Industry (GIND)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Reinforced Concrete
Customer Location: Workshop floor, Kwinana, Western Australia
Application Date: November 2015
Products:
Belzona 4111 (Magma Quartz)
Problem: The workshop floor had been damaged by the caterpillar tracks making 180 degree turns tearing up the concrete.
Photograph Descriptions
1. The damaged concrete floor 2. Another area of damage 3. Close up of the repaired area 4. View of the workshop showing repairs
Application Situation
Workshop Floor where large, 80 Tonne bulldozers and excavators are maintained.
Application Method
Application was carried out in accordance with Belzona System Leaflet FPA-1. The floor area was badly damaged and had to be dug out to provide a suitable surface for rebuilding. Once done the area was re-built to the original level using the Belzona 4111 system.
Belzona Facts
Belzona 4111 was chosen after a successful trial area proved the extremely hard wearing and high load bearing properties of the product. The fast curing nature of the material was also a consideration as it meant the workshop could remain operational during repairs.