KHIA headerKnow-How in Action

VOL XXVI, NO 129

Belzona Upgrades Spirits Containment Area

 
 

Industrien:

General Industry (GIND)

 
 

Know-how Bereiche:

Tanks and Chemical Containment Areas (TCC)

 
 

Kundenstandort:

Distillery, Scotland

 
 

Anwendungsdatum:

2011

 
 

Bearbeitungsgegenstand:

Spirit containment area

 
 

Problem:

The existing protective system had failed. The chemical containment area could no longer be relied upon to prevent liquid loss into the groundwater/watercourse in the event of a spillage.

 
 

Produkte:

Belzona® 4131 (Magma screed) 
Belzona® 4141 (Magma Build) 
Belzona® 5811 (Immersion Grade)

 

Substrate:

Concrete

 
 

Anwendungsmethode:

Application was carried out in accordance with Belzona Know-How System Leaflet TCC-15. Belzona® 4131 and Belzona® 4141 were used to repair the degraded sections of the walls and to create fillets to all horizontal and vertical corners of the bund. The floor was screeded with Belzona® 4131 at 6mm to provide maximum impact resistance. A two coat system of Belzona® 5811 was then applied to all the internal surfaces of the bund.

 
 

Belzona Fakten:

The Belzona system provides excellent resistance to permeation. The reinforcement of wall and floor joints will ensure long term containment without cracking or breaks in the bund lining.

 
 

Bildbeschreibungen

Containment area prior to Belzona Application Concrete Repairs Application of Belzona® 5811 underway Completed Application

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 