KHIA ID: 6042Industry: Oil & Gas (OILG)
Application: SOS-Ships and Offshore Structures (SOS)
Substrate: Carbon SteelCustomer Location: Gulf of Mexico, USA
Application Date: February 2016Products:Belzona 1121 (Super XL-Metal)
Belzona 2211 (MP Hi-Build Elastomer)
Belzona 3111 (Flexible Membrane)
Belzona 3921 (GSC Surface Conditioner)
Belzona 9111 (Cleaner Degreaser)
Belzona 9331 (MR7 Reinforcement Sheet)
Problem: To avoid water and debris from getting between the skid and deck, the gap between the two had to be sealed. Hot work would take weeks to weld the entire perimeter as the gap was 1.5" in some places. The seal also needed to be flexible to absorb any possible vibration.