BELZONA HELPS WITH STERN TUBE REALIGNING

KHIA ID: 9775
Industry: Marine (MRNE)
Application: SOS-Ships and Offshore Structures (SOS)
Substrate: Carbon steel
Customer Location: HAMILTON
Application Date: February 2025
Products: Belzona 1111 (Super Metal),Belzona 1321 (Ceramic S-Metal)

Problem: Some parts of a stern tube was facing erosion corrosion and the crew was finding it hard to align the propeller because of uneven diameter. Belzona chosen to fill the pitting and create an even diameter for better alignment.

Stern tube after cleaning.

Belzona 1111 application completed.

Machining down to required dimensions.

Belzona 1321 application completed.

Application Situation
The shipyard crew was having difficulty aligning the stern tube due to uneven diameter caused by erosion corrosion. Various part were pitted and requires filling and machining to a precise diameter. Belzona was chosen to fill and protect from future deterioration.
Application Method
Affected stern tube lining was blasted to the level of cleanliness as instructed in the product IFU. Surface was degreased and Belzona 1111 was applied and machined to the required dimension. Two coats of Belzona 1321 were applied afterwards to seal the area. The application was inspected and passed for the alignment of the propeller.
Belzona Facts
Belzona saves the day as crew couldn't come up with any other solution and it was a time efficient application also.