BELZONA SEALS OIL LEAKS ON TRANSFORMER BUSHINGS
Indústria: Power (POWR)
Inscrição: VPF-Valves, Pipes and Fittings (VPF)
Substrato: Ceramic & Metal
Localização do cliente: Gas-Fired Power Plant - Toronto, Canada
Data de aplicação: June 2012
Produtos:
Belzona 1161 (Super UW Metal)
Problema: It was noted that a small oil leak was present at the bushing. No oil should leak from this bushing. The heavy electrical cables were not supported adequately.
Descrições da fotografia
- Transformer bushings
- Ceramic insulator after abrading with Dremel and cleaning
- Ceramic insulator and bushing masked off
- Application completed
Situação do aplicativo
During the summer outage, the maintenance crew noted that some oil was present in the sump pit beneath the transformers.
Método de aplicação
Application was carried out in accordance with Belzona Know-How System Leaflet VPF-11. The ceramic insulator was roughened with a Dremel before applying the Belzona 1161 by brush to seal the oil leaks.
Fatos Belzona
The conventional alternative would have been to drain the transformers, replace the ceramic insulators including the bushings. It would have taken at least 2 days to complete this project. The application of Belzona 1161 as described only took 3 hours per transformer. Two transformers were completed within the same shutdown.