Belzona Repairs Concrete Footing

KHIA ID: 7564
Industry: Buildings & Structures (BSTR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Concrete and Steel Reinforcement
Customer Location: Construction company, Slovakia
Application Date: 2006
Products:

Belzona 4111 (Magma-Quartz)


Problem: The footing was damaged by impact, this caused instability on the machine which meant it could not be used. 
Photograph Descriptions

1. Destroyed concrete footing.

2. Belzona 4911 (TX Conditioner) application

3. Repair in progress

4. Belzona 4111 used to rebuild the base

Application Situation
The concrete footing of a cutting machine in a large workshop.
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet TCC-9.
Belzona Facts
The Belzona concrete reapair allowed the machinery to be back online in only 4 days, compared to the possible 28 day cure time for concrete. The Belzona materials also have greater impact resistance to protect from future damage.