Hospital Drain

KHIA ID: 9706
Industry: Buildings & Structures (BSTR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Columbia TN
Application Date: August 2024
Products: Belzona 4111 (Magma-Quartz),Belzona 5231 (SG Laminate)

Problem: Drain was leaking in patients room.

Drain condition before repair with Belzona

Drain condition before repair with Belzona

Final application of Belzona solution

Final application of Belzona solution

Application Situation
Customer was planning on replacing the concrete and drain before I gave them the option to repair it.
Application Method
Concrete was prepared with hand tools and cleaned before doing the repair.
Belzona Facts
Belzona was cheaper and less time consuming than to replace the old concrete and drain