KHIA ID: 10155Industry: Commercial Facilities (COMM)
Application: FPA-Floor Problem Areas (FPA)
Substrate: ConcreteCustomer Location: South Florida
Application Date: April 2023Products: Belzona 4124 (Bulkfill),Belzona 4131 (Magma-Screed),Belzona 4911 (Magma TX Conditioner)
Problem: The surface of the concrete floor had become damaged due to heavy forklifts traffic and impact from heavy pallets being loaded and unloaded. The uneven surface was making it increasingly difficult for the the safe operation of their busy schedule.
Damaged sections of the floor
After surface preparation, the area was conditioned with Belzona 4911
The area was filled with Belzona 4124 except for the top 1/4 inch
Top 1/4 inch was filled with Belzona 4131