KHIA ID: 9594Industry: Pulp & Paper (PLPR)
Application: WPA-Wall Problem Areas (WPA)
Substrate: ConcreteCustomer Location: Port Alberni, BC
Application Date: April 2024Products: Belzona 4111 (Magma-Quartz),Belzona 5821
Problem: The mill load hog fuel for the boiler system. This 15-20 foot wall gets constantly loaded with hog to be sent the boiler via a conveyor system at its base. The wall was badly eroded and 'hang-ups' were occurring and thes stopped the flow to the boiler. A slick finish was needed to allow the hog to slide freely to the conveyor below
Eroded and damaged wall.
Damaged wall.
Application of Belzona 4111 to repair concrete.
Finished application.