KHIA ID: 7880Industry: Power (POWR)
Application: WPA-Wall Problem Areas (WPA)
Substrate: SteelCustomer Location: Power Plant, Western Region of Saudi Arabia
Application Date: 2017Products:Belzona 1311 (Ceramic R-Metal)
Problem: Inspection during the Power Plant shutdown showed severe erosion on the rubber-lined condenser water box, with thickness loss of around 5-6 millimeters in localised areas.
1. Application overview 2. Close up of damage showing erosion and cavitation damage 3. The water box repaired with Belzona 1311 (Ceramic R-Metal)