10 YEARS ON BELZONA® 4131 KEEPS ON PROTECTING
Industry: Power (POWR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: concrete
Customer Location: Power Plant, Central Alabama U.S.A.
Application Date: 1998
Products:
Belzona® 4131 (Magma Screed)
Belzona® 4141 (Magma Build)
Problem: Chemicals had attacked the old lining and the concrete had deteriorated behind the fiberglass lining. Environmental contamination about to occur.
Photograph Descriptions
- Overview of the deterioration exposed during surface preparation
- One hole of 6 inches in depth
- & 4 Applying Belzona® 4131
Application Situation
Neutralization Basin for a Power Plant was getting attacked by the acid/ caustic mixture.
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet TCC-9.
Belzona Facts
Belzona was still protecting the pit beside this one for ten years. When a competitors material failed Belzona was selected to repair this basin. This basin is now ten years old and the second pit is still perfect over 19 years on.