BELZONA SUPERWRAP II SUCCESSFULLY TACKLES A LIVE LEAK REPAIR
Industry: Power (POWR)
Application: ()
Substrate: Fiberglass
Customer Location: Florida, USA
Application Date: November 2017
Products:
Belzona 1212 Belzona Superwrap II System
Problem: The pipe burst after an outage causing the plant to shutdown.
Photograph Descriptions
1. Showing damage. 2. Surface preparation. 3. Plate bonding with Belzona 1212. 4. Superwrap II System installed.
Application Situation
Fiberglass 36" pipe of a cooling tower.
Application Method
The repair area and a pre-fabricated steel plate were sandblasted. The steel plate was bonded with Belzona 1212 followed by an application of the Superwrap II System.
Belzona Facts
The pipe burst after another repair had taken place. Belzona Team responded to an emergency call from this Customer promptly, and carried out the repair in 5 hours within the same day as the call was received. The cooling tower and the plant were back on line the next morning.