BELZONA TAKES OFF AT THIS INTERNATIONAL AIRPORT
Industry: General Industry (GIND)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Steel reinforced concrete.
Customer Location: International Airport, U.S.A.
Application Date: 1993
Products:
Belzona® 4111 (Magma Quartz)
Problem: Certain sections of the runway and ramps were spalled from both thermal cycling as well as mechanical damage from constant aircraft traffic.
Photograph Descriptions
- Spalled concrete on runway
- Surface prepared by chipping loose concrete
- Conditioned with Belzona® 4911 (Magma TX Conditioner)
- Curing of completed repair being accelerated with heat
Application Situation
Landing areas and ramps.
Application Method
The application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.
Belzona Facts
Belzona® 4111 (Magma Quartz) was mechanically mixed after the damaged areas were prepared and thoroughly condi-tioned. The repair material was hand applied and accelerated with infrared lighting to sufficiently cure in the scheduled four-hour downtime. Nine other repair materials were tried, but all failed because of a combination of slow cure times and poor adhesion characteristics.