Belzona repairs hospital shower

KHIA ID: 9927
Industry: Buildings & Structures (BSTR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Masonry
Customer Location: Lafayette
Application Date: June 2025
Products: Belzona 5815,Belzona 9111 (Cleaner Degreaser)

Problem: Patient rooms shower floors leaking

Shower floor before

Shower floor during surface preparation

Shower floor after completion

Application Situation
Patient shower floor was leaking when showers were being used. This was causing ceiling tile to be wet on the floor beneath and causing bacteria and having to close patient rooms. Belzona was as ample to do two rooms and release them back in 24 hours.
Application Method
Application was prepped by angle grinder with diamond ad with dust collector. Wiped down with cleaner, degreaser. Applied two coats of Belzona 5815 according to IFU incorporating aggregate.
Belzona Facts
Belzona was able to do two different showers and release the to be used in 24 hours. The competition was say three to four days.