Blast Furnace Gas Leak Pipe Repair
Industrie: Steel & Metal Processing (STEL)
Anwendung: ()
Substrat: Steel
Standort des Kunden: Czech Republic
Antragsdatum: October 2015
Produkte:
Belzona 1211 (E-Metal)
Belzona 1111 (Super Metal)
Problem: Steel plant blast furnace gas inlet had developed a leak and was losing pressure. The repair needed to be done whilst equipment was online.
Fotobeschreibungen
The blast furnace gas inlet.
The repair is underway.
The finished repair.
Anwendungssituation
Steel plant blast furnace gas inlet.
Anwendungsverfahren
The gas leak was causing a risk of explosion, so Belzona 1211 was used to initially seal the crack and stem the flow of gas. Once the leak was stopped, the necessary surface preparation was carried out with a grinder so that a stronger reinforcement of Belzona 1111 and Belzona 9341 reinforcment mesh could be applied to the pipe to provide a long-term reinforcement to the damaged area.
Belzona-Fakten
Use of Belzona solutions allowed the work to be carried out whilst the pipe was online, avoiding costly shutdowns and risk of explosion.