BELZONA ICE MAKER DRUM

KHIA ID: 61
Industry: Power (POWR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Rubber and metal
Customer Location: Nuclear Power Plant in Tennessee
Application Date: 1994
Products:

Belzona® 2221 (MP Fluid)


Problem: Over time rubber is worn. Ethylene glycol leaks from drum through worn joints and prevents freezing of water and production of ice.
Photograph Descriptions
  1. Ice maker drum with worn rubber coated seals leaking glycol.  
  2. Duct tape used for a neat repair and Belzona® 2221 applied.  
  3. The finished application; replacement cost saved.
Application Situation
Ice maker drum has rubber joints
Application Method
The application was carried out in accordance with a modified version of Belzona Know-How Leaflet TCC-3.
Belzona Facts
To replace the drum would have cost over $400,000. The drum was repaired for less than $1,000 in Belzona product. Four drums were repaired at this particular plant.